Time Combo Charts
- In the explorer, click and then select the Time Combo chart type.
- In Time Axis, select the date field and the granularity that you want to analyze the results by.
- In Y-Axis, choose at least two measures to show, such as the total opportunity amount and count of rows. The first measure displays on the time bar graph and each subsequent measure displays on a timeline graph.
- To change the chart display, click and set the chart properties in the Formatting panel.For example, if some of the dataset includes predictions of future amounts, clickPredictive Line under the X-Axis section in the charts properties panel. Or add a reference line to provide a visual cue about a particular point in time.
- To add a reference line, set the position of the reference line by specifying the date in Time.The numerical date you specify should match the granularity selected in the Time Axis field. For example, if you selected Year-Month and want the reference line to start just after August 2016, enter 2016/8. You can also specify a label inLabel for the line, and a color.